The rules, at source.
These are the documents that say what competence means in the built environment. We explain them. We do not replace them. Each line links to the body that publishes the real thing.
Laws, standards and frameworks
125 entries
The law and the core standards
Building Safety Act 2022
Published by UK Parliament, on legislation.gov.uk
In force Law
The Act that overhauled building safety law. It set up the Building Safety Regulator and the powers behind the competence duties.
Building Regulations 2010, Part 2A
Published by UK Government, on legislation.gov.uk
In force Law
Dutyholders and competence. Since 1 October 2023, anyone doing design or building work in England must be competent for it, and whoever appoints them must take all reasonable steps to check.
Read it at the source: Building Regulations 2010, Part 2A Checked
The Construction (Design and Management) Regulations 2015
Published by UK Government, on legislation.gov.uk
In force Law
The health and safety regulations for construction projects, with their own duties for clients, principal designers and principal contractors.
Read it at the source: The Construction (Design and Management) Regulations 2015 Checked
BS 8670-1:2024
Published by BSI
Published Standard
Core criteria for building safety in competence frameworks. A code of practice for the bodies that write sector frameworks, built on skills, knowledge, experience and behaviours.
Managing Competence in the Built Environment
Published by Industry Task and Finish Group, hosted by the Engineering Council
Published Guidance
An industry guide for organisations on how to meet the Industry Competence Committee’s principles for managing competence. Written for firms of every size, small ones included.
Read it at the source: Managing Competence in the Built Environment Checked
Design and engineering
PAS 8671:2022
Published by BSI
Published Standard
The framework for the competence of individual principal designers.
UK-SPEC HRB
Published by Engineering Council
Published Standard
The UK Standard for Professional Engineering Competence and Commitment, set in the context of higher-risk buildings. For engineers and technicians who design, build, maintain or operate them.
RIBA Principal Designer Register
Published by Royal Institute of British Architects
Published Register
RIBA’s register of chartered architects who have shown they can take on the principal designer role under CDM and the Building Regulations.
Read it at the source: RIBA Principal Designer Register Checked
CIAT Principal Designer Register
Published by Chartered Institute of Architectural Technologists
Published Register
CIAT’s register of Chartered Architectural Technologists who have qualified as principal designers under the Building Regulations.
Read it at the source: CIAT Principal Designer Register Checked
Managing construction
PAS 8672:2022
Published by BSI
Published Standard
The framework for the competence of individual principal contractors.
Built Environment – Framework for the competence of Site Supervisors in England
Published by Competence Steering Group, Working Group 9; hosted by the ICM
Published Competence framework
A competence framework for the people who supervise work on site for a principal contractor, and for the lead person of each firm doing a work package. Issued January 2023.
Competence Framework for Procurement in the Built Environment in England
Published by CIPS, for Sector Led Group 8 of the Industry Competence Steering Group
Published Competence framework
A competence framework for anyone who buys for a built environment project, whether for a client or an employer. Published 8 April 2025.
Read it at the source: Competence Framework for Procurement in the Built Environment in England Checked
Trades and installation
Interiors and fit-out
Painting and Decorating
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Solid Plastering
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Wall and Floor Tiling
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Raised Access Flooring
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Suspended Ceiling Installation
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Suspended Ceiling Installation Checked
Blind and Solar Shading Systems Installation, Service and Maintenance
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Blind and Solar Shading Systems Installation, Service and Maintenance Checked
Glazed Partition
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Dry Lining
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Fibrous Plastering
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Steel Framed Systems
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Site Carpentry - Specific to First and Second Fix Activities (Doors and Stairs)
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Moveable Walls
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Service Moveable Walls
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Complex Ceilings
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Modular Partitions
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Insitu Floor Installer
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Kitchen Fitter
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB covers it in its Fitted Interiors framework, which CITB’s own page lists as Under Review.
Bedroom Fitter
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB covers it in its Fitted Interiors framework, which CITB’s own page lists as Under Review.
Bathroom Fitter
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB covers it in its Fitted Interiors framework, which CITB’s own page lists as Under Review.
Floorcovering
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Floorcovering x 3”. CITB’s own page for it lists it as Under Review.
Industrial Painter
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Point of Purchase
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Install Acoustic Packages and Frames
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Read it at the source: Install Acoustic Packages and Frames Checked
Architectural Joinery
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Shopfitting
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Shopfitting x 2”. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Envelope and roofing
External Wall Insulation
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “External Wall Insulation x 3”. CITB’s own page for it lists it as Published.
Brise Soleil and Louvre Installation, Service and Maintenance
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Brise Soleil and Louvre Installation, Service and Maintenance Checked
Mastic Asphalt
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Roof & Wall Sheeting & Cladding
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2026. CITB says its plan may change.
Read it at the source: Roof & Wall Sheeting & Cladding Checked
Liquid Applied Membrane Roofing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2026. CITB says its plan may change.
Read it at the source: Liquid Applied Membrane Roofing Checked
Reinforced Bitumen Membrane Roofing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2026. CITB says its plan may change.
Read it at the source: Reinforced Bitumen Membrane Roofing Checked
Single Ply Membrane Roofing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2026. CITB says its plan may change.
Insulated Framed Sections
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2027. CITB says its plan may change.
External Rendering
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2028. CITB says its plan may change.
Fully Supported Lead and Hard Metal Roofing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2028. CITB says its plan may change.
Read it at the source: Fully Supported Lead and Hard Metal Roofing Checked
Joint Sealant Application
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Roof Line Systems
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Fabric Membrane Cladding
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Timber Decks & Cladding
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Preassembled Roof Structure Installer
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Read it at the source: Preassembled Roof Structure Installer Checked
Structures
Bricklaying
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Brickwork Technician
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Formwork
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Formwork x 3”. CITB’s own page for it lists it as Published.
Read it at the source: Formwork Checked
Concrete Drilling and Sawing Operative
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Concrete Drilling & Sawing x 3”. CITB’s own page for it lists it as Published.
Read it at the source: Concrete Drilling and Sawing Operative Checked
Concrete Repair Operative
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Steelfixing
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Demolition
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Demolition x 4”. CITB’s own page for it lists it as Under Review.
Metal Decking and Stud Welding
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Under Review.
Read it at the source: Metal Decking and Stud Welding Checked
Construction using offsite manufactured assemblies - Steel Frame Installer
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Cold Formed Steel Frame (CMA) x 3”. CITB’s own page for it lists it as Under Review.
Read it at the source: Construction using offsite manufactured assemblies - Steel Frame Installer Checked
Timber Frame Erection
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2027. CITB says its plan may change.
Erection of Pre-cast Concrete (CMA)
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Erection of Pre-cast Concrete (CMA) x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2027. CITB says its plan may change.
Read it at the source: Erection of Pre-cast Concrete (CMA) Checked
Light Structural Timber Framing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2027. CITB says its plan may change.
Read it at the source: Light Structural Timber Framing Checked
Scaffolding
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2027. CITB says its plan may change.
Installing Construction Anchors and Testing of Construction Fixings
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2027. CITB says its plan may change.
Read it at the source: Installing Construction Anchors and Testing of Construction Fixings Checked
Refractory Installations
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Refractory Installations x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2027. CITB says its plan may change.
Modular/Portable Building
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2028. CITB says its plan may change.
Post Tensioning Operations
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Post Tensioning Operations x 2”. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2028. CITB says its plan may change.
Stonemasonry
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Stonemasonry x 7”. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2028. CITB says its plan may change.
Box Beam Post Tensioning
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2028. CITB says its plan may change.
Architectural Metalwork
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Industrial Storage Systems
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Industrial Storage Systems x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Structural Repair
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Structural Repair x 2”. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Structural Post & Beam Carpentry
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Read it at the source: Structural Post & Beam Carpentry Checked
Doors, gates and shutters
Powered Pedestrian Door Installer and Service Technician
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Powered Pedestrian Door Installer and Service Technician Checked
Non-Powered Pedestrian Door Installer and Service Technician
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Non-Powered Pedestrian Door Installer and Service Technician Checked
Automated Gate System Installer and Service Technician
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Automated Gate System Installer and Service Technician Checked
Shutter and Roller Door Installer and Service Technician
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Read it at the source: Shutter and Roller Door Installer and Service Technician Checked
Fire Doors, Shutters & Curtains (Non-Timber & Composite)
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2026. CITB says its plan may change.
Read it at the source: Fire Doors, Shutters & Curtains (Non-Timber & Composite) Checked
Loading Bay Equipment Installation
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Read it at the source: Loading Bay Equipment Installation Checked
Non-Timber and Non-Composite Fire-Resisting Door, Shutter or Curtain Systems
Published by CITB
Published Competence framework
CITB’s competence framework for the people who install, maintain and repair metal fire doors, fire shutters and fire curtains. CITB’s own page for it lists it as Published.
Read it at the source: Non-Timber and Non-Composite Fire-Resisting Door, Shutter or Curtain Systems Checked
Insulation and building treatment
Wood Preservation and Damp Proofing
Published by CITB
Under review Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Under Review.
Read it at the source: Wood Preservation and Damp Proofing Checked
Cold Roof Insulation
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Underfloor Insulation
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Insulated Enclosures
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Insulated Enclosures x 2”. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Wall Tie Replacement
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Hybrid Walls
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Park Homes
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Room in Roof
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Groundworks and civils
Highways Surface Treatments (manual)
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Highways Surfacing x 5”. CITB’s own page for it lists it as Published.
Read it at the source: Highways Surface Treatments (manual) Checked
Structural Waterproofing
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Piling Operations
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Piling Operations x 5”. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2026. CITB says its plan may change.
Pavement Marking
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Pavement Marking x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2026. CITB says its plan may change.
Installation of Gas Membranes
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2027. CITB says its plan may change.
Read it at the source: Installation of Gas Membranes Checked
Tunnelling Operations
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Tunnelling Operations x 8”. CITB’s plan of May 2026 lists it as in development, with a completion date of January 2027. CITB says its plan may change.
Groundworker / Civil Engineering Operations
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2027. CITB says its plan may change.
Read it at the source: Groundworker / Civil Engineering Operations Checked
Road Building & Maintenance
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with completion dates from April 2027 to January 2028. CITB says its plan may change.
Underpinning
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Underpinning x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Dewatering
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Dewatering x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Ground Anchors
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with completion dates from April 2028 to July 2028. CITB says its plan may change.
Retaining Structures
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Chemical and Resin Grouting
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Basement Construction
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Dynamic Pile Testing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Roadbuilding & Highways
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Roadbuilding & Highways x 3”. CITB’s plan of May 2026 lists it as in development, with a completion date of October 2028. CITB says its plan may change.
Heritage
Architectural Surface Preservation
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Architectural Surface Preservation x 2”. CITB’s own page for it lists it as Published.
Read it at the source: Architectural Surface Preservation Checked
Heritage Skills
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with completion dates from July 2027 to October 2028. CITB says its plan may change.
Specialist trades and site operations
Water Jetting
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Trade Supervisor
Published by CITB
Published Competence framework
CITB’s competence framework for this trade. CITB’s own page for it lists it as Published.
Site Logistics
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan shows it as “Site Logistics x 2”. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2027. CITB says its plan may change.
Product, Equipment and Machinery Installation
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Read it at the source: Product, Equipment and Machinery Installation Checked
Survey for Installation
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of April 2028. CITB says its plan may change.
Damage Repair & Resurfacing
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Protective Component Installation
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Read it at the source: Protective Component Installation Checked
Protection System Independent Verification
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Read it at the source: Protection System Independent Verification Checked
Testing, Inspection and Examination of Plant
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Read it at the source: Testing, Inspection and Examination of Plant Checked
Leak Detection
Published by CITB
In development Competence framework
CITB’s competence framework for this trade. CITB’s plan of May 2026 lists it as in development, with a completion date of July 2028. CITB says its plan may change.
Fire safety
The Regulatory Reform (Fire Safety) Order 2005
Published by UK Government, on legislation.gov.uk
In force Law
The main fire safety law for workplaces and the shared parts of blocks of flats in England and Wales. It puts the duty on a responsible person, who must have a fire risk assessment.
Read it at the source: The Regulatory Reform (Fire Safety) Order 2005 Checked
The Fire Safety (England) Regulations 2022
Published by UK Government, on legislation.gov.uk
In force Law
Extra duties for the responsible person of a building in England with two or more homes and shared parts. All must give residents fire door information; above 11 metres, fire doors must be checked.
Read it at the source: The Fire Safety (England) Regulations 2022 Checked
BS 8674:2025
Published by BSI
Published Standard
A code of practice for judging the competence of individual fire risk assessors. Published 15 August 2025.
Construction products
Draft BS 8670-2
Published by BSI
Draft Standard
The planned second part of BS 8670: core criteria for the competence of people who work with construction products. BSI lists it as a draft, dated 12 May 2026.
Building control and regulation
Building inspector competence framework (BICoF)
Published by Building Safety Regulator, on GOV.UK
Published Competence framework
The framework building inspectors in England are measured against when they register with the Building Safety Regulator. Last updated 22 May 2026.
Read it at the source: Building inspector competence framework (BICoF) Checked
Competence Framework for Fire Safety Regulators
Published by National Fire Chiefs Council
Published Competence framework
A competence framework for the fire and rescue service staff who enforce fire safety law in buildings. Version 2.0, 28 June 2023.
Read it at the source: Competence Framework for Fire Safety Regulators Checked
Buildings in use
PAS 8673:2022
Published by BSI
Published Standard
Competence requirements for managing safety in residential buildings.
Plain-English summaries, not legal advice and not the standards themselves. Always work from the published document.
This is where your competence lives.
Learn it, keep it, prove it. Or see it across your whole team. Start with one record.